BG&E were engaged to undertake temporary works for the fabrication, transportation and erection of the steel roof for the Sydney Football Stadium.
BG&E undertook erection staging of the major roof elements. These works included a staged FEA model for each roof element member by member with temporary supports on the pitch to control the local soil bearing and overturning.
BG&E reviewed the lifting studies and incorporated lifting requirements and out of plane lift loads and support conditions. BG&E designed the temporary support jigs and mechanisms to allow movement in the stressing stages and lifting of the radial arches.
Location
Client
Key Outcomes
Enabled safe and precise erection of the stadium’s steel roof
Ensured structural integrity through staged FEA modelling
Facilitated seamless assembly with customised support jigs