In 2023, the prime location of 37 Pier Street, situated in the vibrant heart of Perth CBD, was acquired for a sum exceeding $20 million. Under new ownership, the hotel is undergoing a significant transformation into a lifestyle hotel with modern amenities that will attract both travellers and the local Perth community.
BG&E was engaged by Total Project Management alongside architects Hames Sharley to refurbish the existing hotel façade, implementing a contemporary glazing and cladding scheme. The façade’s revitalisation will breathe new life into the hotel’s exterior – aligning it with the upgraded interior and enhancing its capabilities in both aesthetics and performance – specifically, in acoustic and structural specifications.
BG&E Façade Consultants provided the following services
- Advice on façade design and interfaces.
- Wind assessment and base façade requirements.
- Review of contractor documentation and installation.
- Specialist advice on the façade system, enabling an FP1.4 performance solution pathway.
BG&E also provided structural design and engineering services, encompassing
- Floor usage changes and loading assessments.
- Strengthening works, including provisions for load bearing wall removal, additional feature stairs, mechanical and plant upgrades, and additional event spaces.
- Seismic assessment of the existing and modified structure.
- Construction engineering advice and temporary works design.
As of mid-2024, this redevelopment is currently under construction.
Location
Client
Key Outcomes
Modernised façade with contemporary glazing and cladding
Enhanced acoustic and structural performance of the façade
Seamlessly upgraded façade to match interior renovations, enhancing the hotel's appeal