Berry’s Bay Upgrades, Western Harbour Tunnel
As part of a major upgrade of marine facilities at Berry’s Bay in Sydney Harbour, BG&E undertook the design of a variety of new facilities and upgrades to existing infrastructure to Transport for NSW standards and a 50 year design life.
Design elements for the structural (non- maritime and maritime) design in this package have been developed through cross- disciplinary coordination. The scope of the civil and structural design included the following maritime and non-maritime elements.
Maritime elements
- Sandstone foreshore
- Reinforced concrete kayak ramp.
- Steel walkway over kayak
- Masonry sea wall crack
- Rip rap rectification for the sea wall along the
Non-maritime elements
- Reinforced concrete retaining
- Reinforced concrete integrated
- Steel viewing platform and
- Steel walkway over
- Steel raised walkway in bund
- Steel
- Reinforced concrete
- Sandstone gravity
- Sandstone bund wall
- New Woodley shed steel and timber
Location
Client
Key Outcomes
Delivered 50-year design life for maritime and non-maritime assets through cross-disciplinary structural and civil design
Designed integrated upgrades across foreshore, seawalls, walkways and retaining structures to meet Transport for NSW standards
Supported safe and functional marine access with kayak ramps, raised walkways, viewing platforms and bund wall solutions