Completion of Crossrail in 2019 led to a significant regeneration of the Moorgate area, including the regeneration of 21 Moorfields, an over-station brownfield site.
The development comprises two office towers which incorporate contemporary commercial space, prime retail, improved pedestrian permeability via a reconfigured highwalk and a new public square with lush manicured landscaping.
BG&E provided construction engineering services, including a complete solution during the tender phase.
Some of the key features of our solution included the temporary works on site being minimised by fabricating larger pieces in the factory and transporting to site, and future hold points being removed by erecting the arches prior to the floors being installed.
Scheduled for completion in 2022, 21 Moorfields is a sustainable development that is set to achieve a 15 percent reduction in embodied carbon.